Ok, so here is my day - I have a 62,000lb building that has about $250,000 of equipment inside that is to be lifted up and over 60' tall oak trees on to a 11'6" x 20' pad at Wash U. The crane being used will take 5 hours to setup, and my boss's boss will be there OR St. Louis Muscle Car tour........hmmmm
I may be able to do both, trying to nail down a time on the shelter set, will let you know by Friday.
Dave, sounds good, but can we go to Lotawota Creek? Linda has been wanting to go there.
Dave, sounds good, but can we go to Lotawota Creek? Linda has been wanting to go there.