Ok experts, chime in. At work I have a lot of generators operating at 5,000' + I'm being told that generators ordered for here in Missouri, will not work there, which I understand, but, what would need to be changed for the generator to operate there?
- No Carbs on these 50kW+ Gensets, as is normal for a diesel engine, so, you don't rejet, but, you could increase injector size and fuel supply size, right?
- Are diesel engines "timed"?
Other changes? Internal engine parts?
Thanks
- No Carbs on these 50kW+ Gensets, as is normal for a diesel engine, so, you don't rejet, but, you could increase injector size and fuel supply size, right?
- Are diesel engines "timed"?
Other changes? Internal engine parts?
Thanks